← Boeing 737

Compare versions

Version 3 → Version 6 (current). Removed · Added. This shows the entry's text as it is written, including its formatting marks.

Version 3 · Version 6 (current) · Version history

Side by side · Together

Version 3Version 6 (current)
17 unchanged paragraphs
The Boeing 737 is a family of jet airliners built by Boeing, first certified by the U.S. Federal Aviation Administration (FAA) in 1967 and extended since then into a dozen derivative models.[2][3]
The Boeing 737 is a family of jet airliners built by Boeing, first certified by the U.S. Federal Aviation Administration (FAA) in 1967 and extended since then into a dozen derivative models.[2][3]
![The first Boeing 737-100 prototype.](/m/2026/11/ZVMQeBogWejiGKks.jpg)
![The first Boeing 737-100 prototype.](/m/2026/11/ZVMQeBogWejiGKks.jpg)
*Via Wikimedia Commons: [First Boeing 737-100](https://commons.wikimedia.org/wiki/File:First_Boeing_737-100.jpg) by Gordon Werner, [CC BY-SA 2.0](https://creativecommons.org/licenses/by-sa/2.0).*
*Via Wikimedia Commons: [First Boeing 737-100](https://commons.wikimedia.org/wiki/File:First_Boeing_737-100.jpg) by Gordon Werner, [CC BY-SA 2.0](https://creativecommons.org/licenses/by-sa/2.0).*
## Origins
## Origins
In 1964 Boeing's leaders were divided over whether to build a small regional jetliner. Douglas was already ahead with the DC-9, and several European manufacturers had rival aircraft, so the decision was delayed.[1] Engineer Jack Steiner pressed for a commitment to the 737, going around Boeing's chief executive, Bill Allen, to lobby board members directly, and the board approved the program.[1]
In 1964 Boeing's leaders were divided over whether to build a small regional jetliner. Douglas was already ahead with the DC-9, and several European manufacturers had rival aircraft, so the decision was delayed.[1] Engineer Jack Steiner pressed for a commitment to the 737, going around Boeing's chief executive, Bill Allen, to lobby board members directly, and the board approved the program.[1]
One history of the design says Steiner's team built the 737 on the layout of the 727 and gave it the same fuselage diameter as the 707 and 727, and credits Joe Sutter with hanging the engines under the wings rather than on the tail, as was then usual.[2] The same account says Boeing offered the 737 for sale as a formal program in November 1964, against the BAC-111, the DC-9 and the Sud Caravelle.[2]
One history of the design says Steiner's team built the 737 on the layout of the 727 and gave it the same fuselage diameter as the 707 and 727, and credits Joe Sutter with hanging the engines under the wings rather than on the tail, as was then usual.[2] The same account says Boeing offered the 737 for sale as a formal program in November 1964, against the BAC-111, the DC-9 and the Sud Caravelle.[2]
Lufthansa ordered 21 aircraft of the first version, the 737-100, on 19 February 1965.[2] Another account says Lufthansa placed its order only after Boeing promised not to cancel the program for lack of orders.[1] United Air Lines followed a couple of months later with an order for 40. It wanted a larger aeroplane, so Boeing stretched the design into the 737-200, the first of what the article counts as twelve commercial versions.[1] Orders for the 737 in 1965 totalled 83, against 209 for the DC-9.[1]
Lufthansa ordered 21 aircraft of the first version, the 737-100, on 19 February 1965.[2] Another account says Lufthansa placed its order only after Boeing promised not to cancel the program for lack of orders.[1] United Air Lines followed a couple of months later with an order for 40. It wanted a larger aeroplane, so Boeing stretched the design into the 737-200, the first of what the article counts as twelve commercial versions.[1] Orders for the 737 in 1965 totalled 83, against 209 for the DC-9.[1]
## Building and certifying the first aircraft
## Building and certifying the first aircraft
The first airframes were assembled in the summer of 1966 in Plant II at Boeing Field, and the official rollout took place on 17 January 1967.[2] The prototype, serial number 19437 and registered N73700, first flew on 9 April 1967 for about two and a half hours, with Brien Wygle and Lew Wallick as test pilots.[2] The test and certification program used six aircraft, four 737-100s and two 737-200s; the two -200 test aircraft, both for United, first flew on 8 and 31 August 1967.[2]
The first airframes were assembled in the summer of 1966 in Plant II at Boeing Field, and the official rollout took place on 17 January 1967.[2] The prototype, serial number 19437 and registered N73700, first flew on 9 April 1967 for about two and a half hours, with Brien Wygle and Lew Wallick as test pilots.[2] The test and certification program used six aircraft, four 737-100s and two 737-200s; the two -200 test aircraft, both for United, first flew on 8 and 31 August 1967.[2]
The FAA issued the type certificate (A16-WE) on 15 December 1967, and Lufthansa took delivery of the first 737 on 28 December 1967.[2]
The FAA issued the type certificate (A16-WE) on 15 December 1967, and Lufthansa took delivery of the first 737 on 28 December 1967.[2]
## Slow sales and recovery
## Slow sales and recovery
The DC-9 regularly outsold the 737 for the next few years.[1] According to Peter Morton, the 737's marketing manager from 1969 to 1974, Boeing's leaders considered selling the program to a Japanese manufacturer. Morton led a task force that recommended keeping it, arguing that the 737 could serve remote airports and carry mixed loads of passengers and cargo. On 13 September 1972 a 737-200 landed on a grass airstrip at Hope, British Columbia, to show it could operate from rough fields, which Morton said helped revive sales.[1] Early-1970s orders from Sabena (ten aircraft), three jointly operated Brazilian airlines and the U.S. Navy were, in the same account, vital to keeping the program alive.[1] Boeing introduced the 737-200 Advanced in 1971, with more capacity and range.[1]
The DC-9 regularly outsold the 737 for the next few years.[1] According to Peter Morton, the 737's marketing manager from 1969 to 1974, Boeing's leaders considered selling the program to a Japanese manufacturer. Morton led a task force that recommended keeping it, arguing that the 737 could serve remote airports and carry mixed loads of passengers and cargo. On 13 September 1972 a 737-200 landed on a grass airstrip at Hope, British Columbia, to show it could operate from rough fields, which Morton said helped revive sales.[1] Early-1970s orders from Sabena (ten aircraft), three jointly operated Brazilian airlines and the U.S. Navy were, in the same account, vital to keeping the program alive.[1] Boeing introduced the 737-200 Advanced in 1971, with more capacity and range.[1]
Deregulation of U.S. airlines in the late 1970s raised demand: Boeing sold 37 aircraft in 1977 and 145 in 1978.[1] The 737-200 went out of production in 1988 after more than 1,000 had been built, and two years later the 737 became the best-selling commercial jet.[1] Later versions included the 300, 400 and 500 (the "Classics") in the 1980s, the Next Generation models (600 to 900) and the 737 MAX.[1] A 2016 newspaper article put the 737 at about a quarter of the world's passenger jets, with the Airbus A320 as the second best-selling jetliner.[1]
Deregulation of U.S. airlines in the late 1970s raised demand: Boeing sold 37 aircraft in 1977 and 145 in 1978.[1] The 737-200 went out of production in 1988 after more than 1,000 had been built, and two years later the 737 became the best-selling commercial jet.[1] Later versions included the 300, 400 and 500 (the "Classics") in the 1980s, the Next Generation models (600 to 900) and the 737 MAX.[1] A 2016 newspaper article put the 737 at about a quarter of the world's passenger jets, with the Airbus A320 as the second best-selling jetliner.[1]
## The Classic series: 737-300, -400 and -500
## The Classic series: 737-300, -400 and -500
Boeing grouped the 737-300, -400 and -500 as the "Classic" series, built between the original 737-100 and -200 and the Next-Generation models.[9] The 737-300 was rolled out on 17 January 1984, with USAir and Southwest Airlines as launch customers; the 737-400 on 26 January 1988, launched by Piedmont Airlines; and the 737-500 on 28 February 1990, launched by Southwest.[9] Southwest took delivery of its first 737-300 with CFM engines in November 1984 and named it *Kitty Hawk*, and General Electric's account says it first flew with passengers on 17 December 1984.[10]
Boeing grouped the 737-300, -400 and -500 as the "Classic" series, built between the original 737-100 and -200 and the Next-Generation models.[9] The 737-300 was rolled out on 17 January 1984, with USAir and Southwest Airlines as launch customers; the 737-400 on 26 January 1988, launched by Piedmont Airlines; and the 737-500 on 28 February 1990, launched by Southwest.[9] Southwest took delivery of its first 737-300 with CFM engines in November 1984 and named it *Kitty Hawk*, and General Electric's account says it first flew with passengers on 17 December 1984.[10]
On 9 December 1999 Boeing rolled the last Classic 737, a 737-400, off the Renton assembly line, completing a run it counted at 1,988 aircraft: 1,113 737-300s, 486 737-400s and 389 737-500s.[9] The same release gave 30 737-100s and 1,114 737-200s for the first generation, a combined total of 3,132 aircraft for the 737 before the Next-Generation models.[9] It put the Classic production record at 21 aircraft a month in 1991 and said the Next-Generation 737 was then being built at 24 a month, within a Renton output of 32 jetliners a month in 1999.[9] Boeing said customers had announced orders for over 4,300 737s of all types at that date.[9] These figures are Boeing's own, as of December 1999.
On 9 December 1999 Boeing rolled the last Classic 737, a 737-400, off the Renton assembly line, completing a run it counted at 1,988 aircraft: 1,113 737-300s, 486 737-400s and 389 737-500s.[9] The same release gave 30 737-100s and 1,114 737-200s for the first generation, a combined total of 3,132 aircraft for the 737 before the Next-Generation models.[9] It put the Classic production record at 21 aircraft a month in 1991 and said the Next-Generation 737 was then being built at 24 a month, within a Renton output of 32 jetliners a month in 1999.[9] Boeing said customers had announced orders for over 4,300 737s of all types at that date.[9] These figures are Boeing's own, as of December 1999.
## The Next Generation models
## The Next Generation models
![A Southwest Airlines Boeing 737-800, one of the Next Generation models.](/m/2026/11/fZ5kd2QPWSapY0pG.jpg)
*Via Wikimedia Commons: [Southwest Boeing 737-800 N8676A BWI MD1](https://commons.wikimedia.org/wiki/File:Southwest_Boeing_737-800_N8676A_BWI_MD1.jpg) by Acroterion, [CC BY-SA 4.0](https://creativecommons.org/licenses/by-sa/4.0).*
Southwest Airlines launched the Next-Generation 737 program in November 1993 with an order for 63 737-700s.[7][8] The program covered the 737-600, -700 and -800, which use CFM56-7 engines made by CFMI, a joint venture of General Electric and Snecma.[7] Boeing said the CFM56-7 had 10 percent higher thrust capability than the CFM56-3C engines on the 737s then in production.[7] The redesigned wing was 25 percent larger, at 1,340 square feet, and carried 30 percent more fuel, a total of 6,878 U.S. gallons; Boeing estimated a range of about 3,000 nautical miles, up to 900 nautical miles more than the 737s then in production.[7]
Southwest Airlines launched the Next-Generation 737 program in November 1993 with an order for 63 737-700s.[7][8] The program covered the 737-600, -700 and -800, which use CFM56-7 engines made by CFMI, a joint venture of General Electric and Snecma.[7] Boeing said the CFM56-7 had 10 percent higher thrust capability than the CFM56-3C engines on the 737s then in production.[7] The redesigned wing was 25 percent larger, at 1,340 square feet, and carried 30 percent more fuel, a total of 6,878 U.S. gallons; Boeing estimated a range of about 3,000 nautical miles, up to 900 nautical miles more than the 737s then in production.[7]
The first 737-700 flew on 9 February 1997, taking off from Renton Municipal Airport and landing at Boeing Field in Seattle after 3 hours and 35 minutes. By then 24 airlines had ordered 523 737-600, -700 and -800 aircraft, which Boeing described as a sales record before a first rollout.[7] The same release expected Southwest to take its first delivery in October 1997; in the event the airline took the first 737-700 at Boeing Field on 17 December 1997, after a three-year effort to win certification from the FAA that included more than 20,000 engineering laboratory and airplane tests.[8] Boeing then counted orders for Next-Generation 737s from 36 customers.[8] All figures in this section are Boeing's own, from its press releases of the time.
The first 737-700 flew on 9 February 1997, taking off from Renton Municipal Airport and landing at Boeing Field in Seattle after 3 hours and 35 minutes. By then 24 airlines had ordered 523 737-600, -700 and -800 aircraft, which Boeing described as a sales record before a first rollout.[7] The same release expected Southwest to take its first delivery in October 1997; in the event the airline took the first 737-700 at Boeing Field on 17 December 1997, after a three-year effort to win certification from the FAA that included more than 20,000 engineering laboratory and airplane tests.[8] Boeing then counted orders for Next-Generation 737s from 36 customers.[8] All figures in this section are Boeing's own, from its press releases of the time.
## The 737-900ER
Boeing launched the 737-900ER (Extended Range), earlier known as the 737-900X, on 18 July 2005, after Lion Air, Indonesia's first low-cost carrier, firmed an order for 30 aircraft with purchase rights for 30 more, up to 60 in all, which Boeing valued at $3.9 billion at list prices.[14] Boeing said the model raised maximum single-class seating from 189 to 215 passengers, by adding a pair of exit doors and a flat rear pressure bulkhead, and gave it a range of 3,200 nautical miles, comparable to the 737-800, with CFM56-7B engines.[14] Lion Air took the first 737-900ER on 27 April 2007, and by then had raised its orders for the model to 60.[15]
## Business and military derivatives
Boeing Business Jets was launched in 1996 as a joint venture between Boeing and General Electric.[16] Boeing describes its BBJ as a derivative of the Next-Generation 737-700 that can fly passengers more than 6,000 nautical miles (11,100 kilometers), and in May 2002 it reported that 50 BBJs were completed and in service.[16]
The U.S. Navy's P-8A Poseidon, a maritime patrol aircraft, is described by Boeing as a derivative of the Next-Generation 737-800.[17] Boeing delivered the first production P-8A on 4 March 2012, the first of 13 under a low-rate initial production contract awarded in 2011; the Navy then planned to buy 117 of them to replace its P-3 fleet.[17] As of the date Boeing's program page was read in November 2026, it reported 86% commonality with the Next-Generation 737, and said more than 170 additional P-8s had been delivered to eight operators besides the first Navy aircraft, with the Royal Canadian Air Force under contract to become the ninth.[18] These figures are Boeing's own.
## The 737 MAX
## The 737 MAX
![A Boeing 737 MAX 8 aircraft.](/m/2026/11/X-y8TLFCn_hUUZWA.jpg)
*Via Wikimedia Commons: [Southwest Boeing 737-8 MAX N8847Q BWI MD2](https://commons.wikimedia.org/wiki/File:Southwest_Boeing_737-8_MAX_N8847Q_BWI_MD2.jpg) by Acroterion, [CC BY-SA 4.0](https://creativecommons.org/licenses/by-sa/4.0).*
5 unchanged paragraphs
In December 2010 Airbus launched the A320neo, a version of its A320 with new engines that promised up to 15 percent greater fuel efficiency.[3] The House Transportation and Infrastructure Committee's 2020 report records that Boeing at first downplayed the threat, and cites a Boeing press release of 30 August 2011 titled "Boeing Launches 737 New Engine Family with Commitments for 496 Airplanes from Five Airlines"; American Airlines said it was pleased to be the first airline to commit, pledging 100 737-800s and 100 737 MAX aircraft.[3] The report counts the MAX as the twelfth derivative model of the 737. It was certified by the FAA in March 2017 and entered passenger service in May 2017 with Malindo Air of Malaysia.[3]
In December 2010 Airbus launched the A320neo, a version of its A320 with new engines that promised up to 15 percent greater fuel efficiency.[3] The House Transportation and Infrastructure Committee's 2020 report records that Boeing at first downplayed the threat, and cites a Boeing press release of 30 August 2011 titled "Boeing Launches 737 New Engine Family with Commitments for 496 Airplanes from Five Airlines"; American Airlines said it was pleased to be the first airline to commit, pledging 100 737-800s and 100 737 MAX aircraft.[3] The report counts the MAX as the twelfth derivative model of the 737. It was certified by the FAA in March 2017 and entered passenger service in May 2017 with Malindo Air of Malaysia.[3]
On 29 October 2018 Lion Air flight 610 crashed into the Java Sea 13 minutes after takeoff from Jakarta, killing all 189 people aboard, and one Indonesian rescue diver died during recovery work.[3] On 10 March 2019 Ethiopian Airlines flight 302 crashed six minutes after takeoff from Addis Ababa, killing all 157 aboard, including eight U.S. citizens.[3] In both accidents a faulty angle-of-attack sensor and the triggering of MCAS, a flight-control feature Boeing developed to handle stability issues caused by the MAX's new, larger engines and their placement relative to the earlier 737 NG, were involved.[3] In all, 346 people died.[4]
On 29 October 2018 Lion Air flight 610 crashed into the Java Sea 13 minutes after takeoff from Jakarta, killing all 189 people aboard, and one Indonesian rescue diver died during recovery work.[3] On 10 March 2019 Ethiopian Airlines flight 302 crashed six minutes after takeoff from Addis Ababa, killing all 157 aboard, including eight U.S. citizens.[3] In both accidents a faulty angle-of-attack sensor and the triggering of MCAS, a flight-control feature Boeing developed to handle stability issues caused by the MAX's new, larger engines and their placement relative to the earlier 737 NG, were involved.[3] In all, 346 people died.[4]
The FAA grounded the 737 MAX on 13 March 2019, three days after the Ethiopian crash and after China, the European Union and Canada, among others, had acted.[3] The House committee investigated for about 18 months, reviewing an estimated 600,000 pages of documents, and issued a 238-page final report on 16 September 2020.[4] Among its findings, a Boeing test pilot took more than 10 seconds in a simulator to diagnose and respond to an uncommanded MCAS activation and called the condition "catastrophic", while federal guidelines assume a response within four seconds.[4] The FAA lifted the grounding on 18 November 2020, saying it was satisfied with software and other fixes and new pilot training, about 20 months after the aircraft had been grounded.[5]
The FAA grounded the 737 MAX on 13 March 2019, three days after the Ethiopian crash and after China, the European Union and Canada, among others, had acted.[3] The House committee investigated for about 18 months, reviewing an estimated 600,000 pages of documents, and issued a 238-page final report on 16 September 2020.[4] Among its findings, a Boeing test pilot took more than 10 seconds in a simulator to diagnose and respond to an uncommanded MCAS activation and called the condition "catastrophic", while federal guidelines assume a response within four seconds.[4] The FAA lifted the grounding on 18 November 2020, saying it was satisfied with software and other fixes and new pilot training, about 20 months after the aircraft had been grounded.[5]
## Alaska Airlines flight 1282
## Alaska Airlines flight 1282
On 5 January 2024 a Boeing 737-9, operating as Alaska Airlines flight 1282, lost its left mid exit door plug while climbing through about 14,830 feet after takeoff from Portland, Oregon. The sudden loss of cabin pressure injured one flight attendant and seven passengers, all slightly, and the crew landed the aircraft safely at Portland.[6] On 24 June 2025 the U.S. National Transportation Safety Board (NTSB) found the probable cause to be that Boeing had not provided adequate training, guidance and oversight so that its manufacturing personnel could consistently follow the parts-removal process meant to ensure removed bolts were reinstalled. It named the FAA's surveillance and audit planning, which did not adequately identify or ensure Boeing addressed repeated and systemic nonconformances, as a contributing factor, and made 19 new recommendations to the FAA and Boeing.[6]
On 5 January 2024 a Boeing 737-9, operating as Alaska Airlines flight 1282, lost its left mid exit door plug while climbing through about 14,830 feet after takeoff from Portland, Oregon. The sudden loss of cabin pressure injured one flight attendant and seven passengers, all slightly, and the crew landed the aircraft safely at Portland.[6] On 24 June 2025 the U.S. National Transportation Safety Board (NTSB) found the probable cause to be that Boeing had not provided adequate training, guidance and oversight so that its manufacturing personnel could consistently follow the parts-removal process meant to ensure removed bolts were reinstalled. It named the FAA's surveillance and audit planning, which did not adequately identify or ensure Boeing addressed repeated and systemic nonconformances, as a contributing factor, and made 19 new recommendations to the FAA and Boeing.[6]
## Production and certification as of 2026
Boeing's first-quarter 2026 results, published on 22 April 2026, said the 737 program "continues to produce at a 42 per month rate" and that 114 737s were delivered in that quarter, against 105 in the first quarter of 2025.[11] The same release said Boeing expected the 737-7 and 737-10, the two remaining MAX variants, to be certified in 2026, with first delivery anticipated in 2027, and that the 737-10 had entered the final phase of certification flight testing, which Boeing calls Type Inspection Authorization 2.[11]
On 5 June 2026 Boeing reported that its chief executive, Kelly Ortberg, said a fourth 737 production line, the "North Line", would be activated on 6 July 2026. It is the first 737 line in Everett, Washington, and was to start with low-rate initial production and support rates beyond 47 aircraft a month. The same report said the three existing lines at Renton were moving from 42 to 47 aircraft a month that summer, and quoted Ortberg: "We'll move when the production system says we're ready to move."[12] A Boeing report dated 17 July 2026 said the company was "on track to move from building 42 737s a month to 47", with a further increase planned to 52.[13] These are Boeing's own statements of intent and of progress at those dates; they are not independent confirmation of the rates achieved.
## Sources
## Sources
1. Dan Catchpole, "Almost cancelled, the Boeing 737 has endured 49 years", The Daily Herald (Everett, Washington), 26 March 2016. https://www.heraldnet.com/news/almost-cancelled-the-boeing-737-has-endured-49-years/ 2. "The Early History of the Boeing 737", rbogash.com (undated). https://www.rbogash.com/737early.html 3. U.S. House Committee on Transportation and Infrastructure, "Final Committee Report: The Design, Development & Certification of the Boeing 737 MAX", September 2020. https://democrats-transportation.house.gov/imo/media/doc/final_boeing_737_max_report.pdf 4. U.S. House Committee on Transportation and Infrastructure, press release on the final report on the Boeing 737 MAX, 16 September 2020. https://democrats-transportation.house.gov/news/press-releases/after-18-month-investigation-chairs-defazio-and-larsen-release-final-committee-report-on-boeing-737-max 5. American Institute of Aeronautics and Astronautics, "737 Max Cleared to Fly by FAA", 18 November 2020. https://aiaa.org/2020/11/18/737-max-cleared-to-fly-by-faa/ 6. National Transportation Safety Board, investigation DCA24MA063, Alaska Airlines flight 1282 (report AIR-25-04). https://www.ntsb.gov/investigations/Pages/DCA24MA063.aspx 7. Boeing, "Boeing Next-Generation 737 Takes to the Skies", news release, 9 February 1997. https://boeing.mediaroom.com/1997-02-09-Boeing-Next-Generation-737-Takes-to-the-Skies 8. Boeing, "First Boeing 737-700 Goes to Southwest Airlines", news release, 17 December 1997. https://boeing.mediaroom.com/1997-12-17-First-Boeing-737-700-Goes-to-Southwest-Airlines 9. Boeing, "Boeing Rolls Out the Last Classic 737", news release, 9 December 1999. https://boeing.mediaroom.com/1999-12-09-Boeing-Rolls-Out-The-Last-Classic-737 10. General Electric, "Sometimes it takes three to tango: LEAP engines will power Southwest's new fleet of 100", GE news report (Southwest's first CFM-powered 737-300). https://www.ge.com/news/reports/sometimes-it-takes-three-to-tango-leap-engines-will-power-southwests-new-fleet-of-100
1. Dan Catchpole, "Almost cancelled, the Boeing 737 has endured 49 years", The Daily Herald (Everett, Washington), 26 March 2016. https://www.heraldnet.com/news/almost-cancelled-the-boeing-737-has-endured-49-years/ 2. "The Early History of the Boeing 737", rbogash.com (undated). https://www.rbogash.com/737early.html 3. U.S. House Committee on Transportation and Infrastructure, "Final Committee Report: The Design, Development & Certification of the Boeing 737 MAX", September 2020. https://democrats-transportation.house.gov/imo/media/doc/final_boeing_737_max_report.pdf 4. U.S. House Committee on Transportation and Infrastructure, press release on the final report on the Boeing 737 MAX, 16 September 2020. https://democrats-transportation.house.gov/news/press-releases/after-18-month-investigation-chairs-defazio-and-larsen-release-final-committee-report-on-boeing-737-max 5. American Institute of Aeronautics and Astronautics, "737 Max Cleared to Fly by FAA", 18 November 2020. https://aiaa.org/2020/11/18/737-max-cleared-to-fly-by-faa/ 6. National Transportation Safety Board, investigation DCA24MA063, Alaska Airlines flight 1282 (report AIR-25-04). https://www.ntsb.gov/investigations/Pages/DCA24MA063.aspx 7. Boeing, "Boeing Next-Generation 737 Takes to the Skies", news release, 9 February 1997. https://boeing.mediaroom.com/1997-02-09-Boeing-Next-Generation-737-Takes-to-the-Skies 8. Boeing, "First Boeing 737-700 Goes to Southwest Airlines", news release, 17 December 1997. https://boeing.mediaroom.com/1997-12-17-First-Boeing-737-700-Goes-to-Southwest-Airlines 9. Boeing, "Boeing Rolls Out the Last Classic 737", news release, 9 December 1999. https://boeing.mediaroom.com/1999-12-09-Boeing-Rolls-Out-The-Last-Classic-737 10. General Electric, "Sometimes it takes three to tango: LEAP engines will power Southwest's new fleet of 100", GE news report (Southwest's first CFM-powered 737-300). https://www.ge.com/news/reports/sometimes-it-takes-three-to-tango-leap-engines-will-power-southwests-new-fleet-of-100 11. Boeing, "Boeing Reports First Quarter Results", press release, 22 April 2026. https://investors.boeing.com/investors/news/press-release-details/2026/Boeing-Reports-First-Quarter-Results/default.aspx 12. Boeing, "New 737 production line starts operations in July, CEO says", 5 June 2026. https://www.boeing.com/features/2026/06/new-737-production-line-starts-operations-in-july-ceo-says 13. Boeing, "Boeing leaders discuss production gains and rate plans ahead of air shows", 17 July 2026. https://www.boeing.com/features/2026/07/boeing-leaders-discuss-production-plans-ahead-airshows 14. Boeing, "Boeing Launches New Higher Capacity, Longer Range 737", news release, 18 July 2005. https://boeing.mediaroom.com/2005-07-18-Boeing-Launches-New-Higher-Capacity-Longer-Range-737 15. Boeing, "Boeing Delivers First 737-900ER to Launch Customer Lion Air", news release, 27 April 2007. https://boeing.mediaroom.com/2007-04-27-Boeing-Delivers-First-737-900ER-to-Launch-Customer-Lion-Air 16. Boeing, "Milestone for Boeing Business Jets: 50 BBJs Now in Service", news release, 28 May 2002. https://boeing.mediaroom.com/2002-05-28-Milestone-for-Boeing-Business-Jets-50-BBJs-Now-in-Service 17. Boeing, "Boeing Delivers 1st P-8A Poseidon Production Aircraft to US Navy", news release, 6 March 2012. https://boeing.mediaroom.com/2012-03-06-Boeing-Delivers-1st-P-8A-Poseidon-Production-Aircraft-to-US-Navy 18. Boeing, "P-8 Poseidon" (Boeing Defense program page), undated page read November 2026. https://www.boeing.com/defense/patrol-early-warning-and-battle-management/p-8-poseidon